he customer has two furnaces with 2 bays and both of them need to be monitored to ensure that the burning efficiency of the furnace to maintain the furnace temperature above 900◦ C.
Huge quantity of daily vehicular traffic at their plant with loaded scrap iron as raw material. Irregularity suspected in the quality and quantity of material purchased regulations